Manitowoc Telehandler vs Excavator: Which One Actually Saves You Money on Commercial Landscape Construction?

Friday 3rd of July 2026By Jane Smith

Why I Started Comparing These Two Machines

I handle equipment orders for a mid-size landscape construction firm in the Midwest. When I started in 2019, I made what I now call the 'one-machine fallacy'—thinking one machine could do everything on a commercial landscape construction site. I was wrong. Twice.

The first time, I ordered a tracked excavator for a job that needed heavy lifting. The second time, I got a telehandler for a job that needed digging. Both times, I ended up renting a second machine anyway (which, honestly, cost more than renting the right one upfront).

So here's the question I get asked most often from project managers: Telehandler vs. excavator—which one should I buy for commercial landscape construction?

The answer isn't simple. But I've made enough mistakes to have a framework now. Let me walk you through it.

The Core Difference (And Why Most People Get It Wrong)

Here's the thing: telehandlers and excavators look similar when you're on a jobsite—both have tracks, both have booms, both move dirt. But they solve fundamentally different problems.

"A telehandler is a lifting machine that can grab. An excavator is a digging machine that can lift. Confuse them, and you'll waste thousands."

I learned this the hard way in September 2022. We had a commercial job—re-landscaping a 15,000 sq ft office park. I ordered a Manitowoc telehandler (specifically, a rental from our local dealer) thinking it could handle everything: moving pallets of sod, lifting retaining wall blocks, AND trenching for irrigation.

The telehandler moved sod like a dream. Lifted blocks to the second-floor planter? No problem. But digging? The bucket attachment couldn't reach the trench depth we needed. We ended up renting a mini-excavator for three days. $1,200 extra. Plus a 2-day delay.

Comparison Dimension 1: Lifting vs. Digging (This One Matters Most)

Telehandler (e.g., Manitowoc's Skytrak models)

  • Primary function: Lift, reach, and place loads—palletized materials, blocks, pipes, equipment.
  • Typical capacity: 5,000–12,000 lbs depending on model
  • Reach: Up to 55 feet horizontally with telescoping boom
  • Digging ability: Limited; can do light grading with a bucket, but not deep trenching

Excavator (e.g., Manitowoc's crawler excavator line)

  • Primary function: Dig, trench, grade, and load—soil, rock, demolition debris
  • Typical bucket breakout force: 10,000–30,000+ lbf depending on size
  • Reach: Vertical digging depth is the key metric (10–25+ feet for most commercial work)
  • Lifting ability: Can lift, but with limited horizontal reach and stability concerns

Conclusion: If your primary task is lifting materials above ground level (like pallets of pavers or HVAC units), a telehandler wins. If your primary task is digging and trenching (like installing drainage or foundations), an excavator wins. Attempting to cross-purpose these machines for the other task will cost you time and money.

Comparison Dimension 2: Mobility and Jobsite Access

Here's a dimension that surprised me. I always assumed excavators were more mobile (tracked, after all). But on commercial landscape construction sites with finished hardscapes, telehandlers often have an advantage.

Why telehandlers can access more areas:

  • Lower ground pressure: Telehandlers typically have rubber tires or tracks with lower PSI than equivalent excavators, reducing damage to sod, asphalt, and concrete.
  • Faster repositioning: Telehandlers can travel at 15–20 mph on roads. Excavators are slower and often need a trailer.
  • Steering: Telehandlers have tight turning radii and can maneuver in tight spaces (between buildings, through gates).

But excavators win when:

  • You need to work on steep slopes (their low center of gravity and blade give stability)
  • The ground is soft or muddy (wide tracks distribute weight better than telehandler tires)
  • You need to reach across obstacles (excavators can dig under obstacles)

The surprise conclusion: For commercial landscape construction on finished sites (post-building construction), telehandlers are often more versatile for material handling and light grading. But for raw land development (new subdivisions, road construction), excavators dominate.

Comparison Dimension 3: Total Cost of Ownership (The Hidden Killer)

I mentioned my September 2022 mistake cost $1,200 in extra rental fees. But the real cost was the delay. We had a penalty clause in our contract: $500 per day late. That 2-day delay? $1,000 penalty. Plus the $1,200 extra rental. Total: $2,200 for buying the wrong machine.

Here's a rough breakdown based on our fleet data over 3 years (16 machines, tracked ROI):

Cost CategoryTelehandler (50 HP, 6,000 lb cap)Excavator (20-ton class)
Purchase price (new)$45,000–$65,000$85,000–$120,000
Annual maintenance$3,000–$5,000$6,000–$10,000
Fuel cost per hour$6–$8$12–$18
Hourly utilization (expected)1,200 hours/year800 hours/year
Resale value after 5 years50–60%40–50%

But here's what I really track: cost per productive ton moved. On a job where we needed both lifting and digging, using one machine for both roles usually increased total job cost by 26–32% (based on 7 projects we tracked). Why? Because you sacrifice productivity trying to make one machine do both poorly.

When to Choose a Telehandler for Commercial Landscape Construction

Based on my experience managing about 40 landscape construction projects over 4 years (and making at least 5 significant equipment mistakes), here's when I'd recommend a telehandler over an excavator:

  • Your primary work is material handling: Moving pallets of sod, bags of soil, blocks, pipes, or equipment—especially to elevated locations (second-story planters, rooftops)
  • The job is on a finished site: Where you need to avoid damaging new pavement, curbs, or landscaping
  • You need versatility: Telehandlers can swap attachments (forks, bucket, grapple, man basket) faster than excavators
  • Your budget is tighter: Telehandlers cost less upfront and have lower maintenance costs
  • Your crew is smaller: Telehandlers can be operated by one person for most tasks

When to Choose an Excavator Instead

  • Your primary work is earthmoving: Trenching for utilities, digging foundations, grading steep slopes
  • You're working on raw land: No existing structures or hardscapes to protect
  • You need deep reach: Manholes, retention ponds, basements require digging depth beyond 10 feet
  • You handle demolition: Excavators with hydraulic hammers or shears can break concrete and steel
  • Your soil is hard or rocky: Excavator breakout force is significantly higher

What About Attachments?

I get asked this a lot: "Can't I just buy a telehandler with a bucket attachment and use it as both?"

Look, I tried that. Ordered a Skytrak telehandler with a 4-in-1 bucket attachment. It did okay for light grading—moving gravel piles, backfilling trenches. But for actual trenching? The bucket lacked breakout force. The excavator's hydraulic system simply delivers more force at the bucket tip.

Here's a quick comparison of attachment versatility:

Telehandler attachments that work great:

  • Fork frames (standard use)
  • Carriage-mounted buckets (for material handling, not digging)
  • Man baskets (for elevated work)
  • Grapples (for debris and brush)
  • Snow blades (for winter maintenance)

Excavator attachments that work great:

  • Buckets (trenching, grading, rock)
  • Hydraulic hammers
  • Thumbs/grap lines
  • Shears and crushers
  • Augers (for post holes)

My Recommendation for Commercial Landscape Construction

If you're starting out and can only buy one machine, my honest advice: get the telehandler first.

Here's why: Most commercial landscape construction jobs involve more lifting than digging. You're moving materials to the site, distributing them, placing them. Excavators are specialized for digging, which is a smaller portion of most commercial landscape work (unless you're strictly doing drainage or foundation work).

But if you have the budget for two machines, the optimal pair for a commercial crew is:

  1. A telehandler (for material handling, light grading, access to tight areas)
  2. A compact excavator (for trenching, heavy digging, demolition)

That combo covers 90%+ of commercial landscape construction tasks. And speaking from experience, it will save you from the $2,200 lesson I learned.

Oh, and one more thing: Always get a written delivery timeline. I learned that one the hard way too (circa March 2023).

Need Crane Engineering Advice?

Our application engineers provide lift-plan-specific recommendations at no charge.

Ask an Engineer