Lattice boom crawler cranes from 100 to 2,300 tons lifting capacity — purpose-built for bridge erection, wind turbine installation, refinery turnarounds, and heavy industrial lifting. Every crane delivered with full load chart documentation and CE declaration of conformity.
Manitowoc lattice boom crawler cranes cover the complete heavy lift spectrum — from 100-ton utility cranes to 2,300-ton super-heavy lift machines.

Versatile lattice boom crawlers for general construction, bridge girder placement, precast erection, and utility applications. Quick assembly and strong road mobility.

Heavy-duty crawlers for wind turbine erection, refinery vessel lifts, and large infrastructure projects. Modular counterweight and boom systems for flexible configuration.

Super heavy lift class for power plant construction, offshore module lifts, and major industrial installations. Ring-mounted superstructure for maximum stability at high capacities.
Six engineering advantages that make Manitowoc the reference standard for heavy lift crawler cranes.
Since 1902, Manitowoc has been designing and manufacturing lattice boom crawler cranes. Our engineering heritage is reflected in load chart accuracy, structural reliability, and field serviceability.
Interchangeable boom sections and modular counterweight systems allow a single crane to be configured for multiple lift plans — reducing mobilization costs and increasing fleet flexibility.
Every Manitowoc load chart is validated through physical load testing at the factory. Published capacities represent tested values under documented conditions — not theoretical calculations.
Global parts depots, factory-trained technicians, and Service Level Agreements ensure crane availability above 95% on active projects. Emergency parts commitment: 24-hour delivery.
Manitowoc crawler cranes are designed for self-assembly using a smaller assist crane. Modular counterweight pallets and pin-connected boom sections reduce assembly time and site logistics costs.
Full compliance with CE Machinery Directive 2006/42/EC and ASME B30 crane safety standards. Every crane ships with Declaration of Conformity and factory acceptance test records.
"We selected Manitowoc for our bridge erection program because their load charts matched field performance within 2% of published values. Over 14 months of continuous operation, our two 300-ton crawlers achieved 98% availability — directly contributing to an on-time project delivery that earned us the performance bonus."
Provide your lift weight, radius, and boom height requirements — our crane application engineers will deliver a configuration recommendation with load chart verification within 24 hours.